Seaford Draw Bridge Repair

Posted: 08/14/2008 by that's Elbert in Seaford, transportation & roads
Tags: , ,

The draw bridge crossing the Nanticoke River in Seaford will be closed starting Monday, August 18 around 7:00AM. It should re-open on Saturday, August 23 around 6:00PM, weather permitting. Traffic will be re-routed to US13 during that time. The bridge will be adjusted to correct a seating issue.

For those of us that take Alternate 13 to Seaford on occasion, make sure you don’t forget this closure. Hopefully it will be finished in a timely fashion, which it sounds as though it will be.

Advertisements
Comments
  1. D***, that bridge closure stinks. Thanks for the heads up.

  2. billsammons says:

    Any idea when route 404 in Bridgeville is going to open again? It’s been detoured (near Jimmy’s Grille) since we moved to Bridgeville in February, and perhaps long before.